Monday, December 31, 2007
Construction Picture Post

Front of the new building


The new boardwalk tiki area


The back of the winery that faces the courtyard


Breezeway and bathroom area


Side entrance


Front building light fixtures


Glasses hanging on the tree at the new tasting bar


Inside the new tasting room (Christmas figured not included hehe)


Mural on the ceiling inside the tasting room


Under the Grand Tiki


Tiki walkway


Entrance to the actual winery.


Hope you enjoyed the photos! Remember to sign up for our email list so that we can let you know when everything is done.

See you soon.
-Grant "The Web Guy" Walker

Labels: ,

posted by Schnebly Redland's Winery @ 11:31 PM   0 Comments Links to this post


0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home

Home - Our Wines - The Winery - Events - Blog - News - FAQs - Contact

Copyright © 2007 Schnebly Redland's Winery - All rights reserved
Website designed and maintained by Grant Walker of Liqwid Technologies